Construction of kiln air system engineering

Your current location: Home >> News >> Industry News

Construction of kiln air system engineering

Date:2023-07-19 Author:http://jingdianshuji.cn Click:

The construction of kiln air system engineering refers to the construction and installation of kiln air supply system. The construction of kiln air system usually includes the following aspects.


Preparation before construction. Before construction, it is necessary to carry out detailed design and purchase the required materials and equipment. The construction team needs to be well organized and ready with necessary construction tools, instruments and equipment. In addition, it is necessary to investigate and survey the construction site to ensure the smooth progress of construction.


Carry out the construction of civil engineering. Civil engineering includes the construction of kiln fan room, fan foundation and laying of wind pipes. First of all, according to the design requirements, the fan room and fan foundation are built in appropriate positions. Then carry out earthwork excavation, foundation pit support, pouring concrete foundation and other work. Finally, according to the design requirements, install air ducts and other supporting equipment, such as fans and fan brackets.


Conduct the construction of electrical engineering. Electrical engineering includes electrical equipment installation and wire and cable laying. First, according to the design requirements, install electrical equipment, such as fans and electric control cabinets. Then carry out wire and cable laying, wiring, grounding and other work. Finally, the electrical system is tested and debugged to ensure the safety and normal operation of the system.


Carry out the construction of pipeline engineering. Pipeline engineering includes the installation and laying of wind pipes and smoke exhaust pipes. First, according to the design requirements, determine the direction and size of the pipeline. Then install the air duct and seal it so that it has no leakage. Finally, lay and connect the smoke exhaust pipes and seal them to ensure smooth smoke exhaust.


Carry out system debugging and trial operation. System debugging and trial operation are important links. After the construction is completed, the whole system needs to be debugged, including checking the parameters of the fan, adjusting the operating conditions of the fan, and checking the pipeline connection and sealing. At the same time, it is necessary to test the stability and working effect of the whole system, and find and solve problems in time.



Carry out construction acceptance and delivery. After the construction is completed, it is necessary to carry out construction acceptance to check whether the kiln air system project meets the design requirements and construction specifications. After the acceptance, the project will be delivered and put into operation.